|
ES

Main Requirements

Access to our homes requires compliance with a series of requirements, among which are the following. To consult the complete details of conditions, documentation and requirements applicable to the process, consult the award bases.

01

Legal residence

Have Spanish nationality, or legal residence in Spain.

02

Income limit

Comply with established income limits: maximum income per unit of coexistence of the expired fiscal year may not exceed 2.5 times the IPREM.

Consult the IPREM limits table. →
03

Spending limit

Do not allocate more than 30% of the annual net income of the cohabitation unit to the payment of the total annual income.

Max. 30% of income
04

Minimum income

Prove minimum income per family unit or cohabitation for the expired fiscal year of €23,500 annually.

05

Coming of age

Natural persons of legal age, who have full civil powers and do not have any limitation on civil capacity.

06

Census

Be registered in the municipality of Málaga with a minimum uninterrupted seniority of one year, computed immediately before the date of submission of the application.

Min. 1 year in Malaga
07

Habitual residence

Use the home as the habitual and permanent residence of the applicant family unit and be occupied within the legally established deadlines.

08

Registration as a protected housing applicant

Have submitted the application for housing applicant protected in the Registry Municipal Protected Housing of the Malaga City Council.

09

Not having another home

That none of the members of the family unit be the owner of full ownership or of a real right of use or lifelong enjoyment of another home throughout the national territory in protected or free housing.

10

Conflict of interest

The applicant, nor any of the members of his family unit or coexistence, in a situation of conflict of interest.

Award process

01

Registration opening

The deadline for submitting applications will be 15 business days to be computed from the indicated day. in the announcement of the call on the website.

02

Registration form

The submission of applications will be made to the Municipal Housing Institute of Málaga, through the standardized responsible declaration model provided for this call, through the electronic registry or procedure enabled at the electronic headquarters municipal.

03

Preparation of lists

Once the application submission period has ended, the Municipal Housing Institute of Málaga will prepare a provisional list of applications submitted under this call.

Once the deadline for submissions to the provisional list of applications submitted has ended and resolved, the Municipal Housing Institute of Malaga will approve and publish the list definitive of applications, including the order number assigned to each application, which will be used in the draw.

04

Lottery

The drawing procedure will be carried out by the Municipal Housing Institute of Malaga, before a notary public, through the system, routine or mechanism that said body determines, guaranteeing the principles of publicity, equality, transparency and competition.

05

Housing allowance

The provisional assignment of a specific home will be carried out following the order established in the Ordered List of Selected Applications provided by the Municipal Institute of the Malaga housing.

06

Documentary accreditation

At the time of assignment, following the order established in the corresponding List Sorted from Selected Requests, we will contact you for assignment provisional housing for a specific home upon request and request the necessary documentation for the accreditation of requirements, which you must provide within a maximum period of 15 business days from the requirement.

07

Approval of listing by IMV and issuance of certificate

The Superficiario will send the provisional list to the Municipal Housing Institute of Malaga. of pre-awarded persons, along with the corresponding documentation for verification.

The Municipal Housing Institute of Malaga will proceed to verify and validate the documentation provided for the issuance of the certificate.

08

Formalization of the contract

After the documentary validation of the requirements and the acceptance of the home, the preparation and formalization of the rental contract. This will be formalized through your subscription within a maximum period of one month from the complete accreditation of compliance with requirements, as well as from the issuance of the corresponding certificate by the IMV and as long as the homes are habitable.

09

Key delivery

Once the contract is signed, we will contact you to schedule the delivery date of keys.

Documentation for the accreditation of requirements

It is important that you prepare all the necessary documentation. The documentation will vary depending on the characteristics of your cohabitation unit.

0/6

0/6

0/4

0/2

0/1

0/3

AWARD BASES

It will allow you to know all the details of the housing allocation procedure.

DOWNLOAD AWARD TERMS

Applicable regulations

Below, we provide you with access to the regulations that govern the award process and the access to subsidized housing and affordable housing.

Complementary regulations

Lagoom Living District University funded by the European Union - NextGenerationEU

European Union Government of Spain Recovery Plan Official Credit Junta of Andalusia Malaga City SMV